Some Finished, More Planned
Well, finished adding shelves to current cabinets. Kitchen wall cabinet 6'wide X 4'high, and one shelf? Not anymore, almost double the shelving space. Installed new shelving in current bathroom cabinet, the originals were spaced far enough apart to store small appliances. Finished replacing all 921 bulbs(35 total)with LED's,wow what a difference. Finished changing the stove and oven to igniter, love this one, no more kneeling to light the oven. Lower storage organized, eye bolts installed in front wall, layflat tie downs in floor for BQ, fishing pole holders installed on ceiling. Additional waste valve to isolate system from hose connection, no more suprises of what is behind door #2. Install Max Air and Fantastic Vent covers(one each). Now, we are getting ready to remove couch and install a sewing/craft center, still have to weigh the sofa, so I can get close on weight of new system,has anyone done this. The parts for the water filter system have been ordered. Working on converting generator storage area into tool storage, with cabinet and drawers. Busy times.
|