Quote:
Originally Posted by Last2Die View Post
Yes the cut out is already there I would order everything from trekwood and order the genset. The generator doesn’t just sit in that opening without something holding it to the floor right..? I’m assuming the stand from the post above is what would go into the cut out area after the floor is removed.
That is correct. Remove the cutout, install the shroud, install the stand then mount the gen to the stand.
https://onan.xmsi.net/983-0601%20Onan%20HGJAD%20(spec%20A-E)%20HGJAE%20(spec%20A-E)%20HGJAF%20(spec%20A-D)%20Mobile%20Genset%20Installation%20Manual%20(11-2014).pdf#page15