View Single Post
Old 02-06-2015, 07:04 AM   #5
DarMar
Montana Master
 
DarMar's Avatar
 
Join Date: Feb 2004
Location: Brandon
Posts: 3,944
M.O.C. #1034
One of the first thing we do is disconnect the battery and shore power to leave the rig completely dead. Then proceed to take the plastic cover off the electrical panel and tighten all electrical connections that attach within the box. After that and many of the things mentioned above we start adding numerous cord/hose hangers and a shelf in the front compartment and a layer of hanging shelving in the door side storage compartment. As well an 8" x 8' long sewer tube under the front frame to handle all our sewer hoses and plastic eavestrough for hose support when set up. Just a few from here.
__________________
Darwin & Maureen DeBackere
Minnedosa, Manitoba, Canada
2011/3500/Silverado/4x4/DRW/Duramax
2017/3721RL/Legacy Pkg./Pressure-Pro
DarMar is offline   Reply With Quote