View Single Post
Old 06-16-2010, 12:01 PM   #4
carlson
Montana Fan
 
Join Date: Feb 2005
Location: Moultonborough
Posts: 449
M.O.C. #3268
Jacques,
Replaced our a couple of years ago on a 3400 RL.
You need to get flex couplings, for each one of the pipes, that is the rubber couplings with hose clamps on each end.
You need for the top of the tank two rubber inserts, the pipes slide into the inserts, the pipe size of the vent and drain pipe, the tank does not come with the fittings already in the tank.
Short lengths of the pipe for the drain outlet, toilet in and drain line.
Take the toilet out and remove the screws that hold it into the floor.
You will cut the toilet drain pipe about 6" above the storage compartment floor and the vent pipe, I think I removed the valve from the tank.
On the bottom, there is one of the hangers that is welded to the frame and the other is held by bolts.
Have some help removing the tank as it will be heavy from the wasted stuck to the bottom.
Measure the length of the pipes on the old tank, then add a few inches
where it will go into the tank in the.
Just take your time and plan, look at it and plan again.
Good Luck
E. Sven
carlson is offline   Reply With Quote