Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
 

Go Back   Montana Owners Club - Keystone Montana 5th Wheel Forum > MOC Technical Forums > Additions & Improvements
Click Here to Login

 
 
Thread Tools Search this Thread Display Modes
 
Prev Previous Post   Next Post Next
Old 03-17-2011, 01:45 PM   #1
NCFischers
Montana Master
 
Join Date: Aug 2008
Location: New Bern
Posts: 4,370
M.O.C. #8728
Send a message via Yahoo to NCFischers
Drying Rack for Trailer

DRYING RACK FOR TRAILER


Tools needed for assembly:
  • PVC cutter or hack saw
  • Drill with 5/16” drill bit and Ό” drill bits
  • Small hammer
  • Small screw driver to match 6/32 x 1 1/2” screws

Bill of Materials:
  • 2---10’ sticks of Ύ inch schedule 40 PVC pipe
    5---3/4” 90 degree elbows
    1---3/4” 45 degree elbow
    2---3/4” slip tees
    1---3/4” slip/threaded tee
    1---3/4” male adapter
    5---3/4” end caps
    4---6/32 x 1 ½ screws and nuts.
    25 feet---plastic coated clothes line.
    One bottle of clear PVC cement.

Cut PVC into the following lengths:
  • 2---24”
    4---18”
    1---9”
    2---11 ½ ”
    1---14”
    1---2”
    1---1 ½”
    1---45 ½”

Preperation instructions[list_to_fix][*]Cutting the PVC – try to make each cut as square or 90 degrees as possible.
a. Cut one of the 10’ piece in 24”, 24”,18”,18”, 18”, 2”,1.5”, and 9” lengths.
b. Cut the second PVC piece in 11.5”, 11.5”, 14”, 45.5”, and 18” lengths.[*]In each of 18” pieces drill four (Ό” holes) The first hole is 2” from one end and then three more every 4” after that.[*]Take one of the 24”, the 9” and the 14” pieces and draw a center line with a pencil on each. [*]Assembling the ladder end
a. Taking the 9” piece and measure out from the center line 3 Ό” on each side and mark it for the 5/16” hole. Do the same on the 24” and 9” piece. Drill the six holes all the way through both walls of each tube. Try to remain square because the holes need to line up so the three tubes can be bolted together.
b. Insert screws through the 24” long pieces into the 9” piece and install nuts inside the 9” piece. Holding the nut with your pinkie and turning the screws by hand will work. Leave the nuts loose for now.
c. Insert screws through the 14” long pieces into the 9” piece and install nuts inside the 9” piece. Holding the nut with your pinkie and turning the screws by hand will work. Leave the nuts loose for now.
d. Take two end caps and tap them onto the 9” piece with a hammer. Do not glue them.
e. Now tighten all four screws. Holding or wedging between the tubes will put pressure on the nut keeping it from spinning.
f. Glue end caps on the 14” piece.[*]Assembling the remaining parts:
a. Lay the Ladder end flat and glue 90 degree elbows on the ends of the 24” piece. Ensure the 90 degree elbows on the ladder end are facing away from the 9” piece.
b. Take the other 24” piece and glue two slip tee connectors to the ends so the assembly looks like a capital I.
c. Take the two 11” pieces and insert them onto the slip/threaded tee but do not ever glue.
d. Glue a 90 degree elbow on each end of the 11” pieces. You now have three separate assemblies.
e. Take one of the 18” pieces and insert the end with the hole 2” from the end into the 90 degree elbow. Making sure the holes are pointing towards the center so clothes lines can string through. Repeat for the remaining three 18” pieces.
f. Insert the other end of the 18” pieces into the slip tees on the 24” piece.
g. If you are satisfied, glue the 18” pieces in place. Remember the holes point towards the center.
h. Lace the plastic clothes line back and forth through the holes and tie
a knot in both ends. I suggest a figure eight on each end.[*]Assembling the hanging arm:
a. Take the 45 ½ ” piece and glue the male adapter to one end
b. Glue the 45 degree elbow to the other end of the 45 1/2” piece.
c. Glue the 2” piece to the 45 degree elbow.
d. Glue the remaining 90 degree elbow to the other end of the 2” piece.
e. Glue the 1 ½” piece to the 90 degree elbow.
f. Glue the end cap to the 1 ½” piece.[*]Apply some Vaseline or lubricate on the threads of the hanging arm before threading onto the rack. Do not tighten. Three turns should be enough.[*]Assembly complete
NCFischers is offline   Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Drying racks NCFischers North American MOC / Mid-Atlantic-Virginia Region 1 08-04-2011 02:44 PM
Clothes Drying Rack Wayne and Carolyn Mathews General Discussions about our Montanas 9 03-17-2011 05:01 PM
Drying Rack Puzzle pbahlin Sitting around the Campfire 7 10-14-2010 01:05 AM
Drying racks NCFischers North American MOC / Mid-Atlantic-Virginia Region 20 08-11-2010 12:35 PM
Washing and drying..........in house. Ozz Additions & Improvements 16 10-22-2006 04:23 AM

» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3
Disclaimer:

This website is not affiliated with or endorsed by Montana RV, Keystone RV Company or any of its affiliates. This is an independent, unofficial site.


All times are GMT -6. The time now is 12:47 PM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.