I showed up at the dealer at 0900 and after some paperwork and a walk through to learn what buttons did what I took out my MOC PDI checklist. Five hours later I had gone over everything on the list and seen every part of the trailer that was visible. There were only two significant defects found and a few cosmetic ones that they will have fixed in time for delivery on Monday. Here is the list.
Small Stuff
Staple popping up through carpet.
Spot on carpet.
Smudges on ceilings.
Staple holes not puttied over in ceiling.
Small end table dented on top.
Fret work above microwave loose.
Window shade strings not adjusted right causing them to bind and twist when trying to raise or lower.
Bigger Issues
Spring tensioner for wire loom under ODS (LR) slide was stretched allowing the loom and wires to rub on tire when slide was closed. The loom was worn away exposing the wires to this wear. They were rubbed but the insulation was still good.
The small piece of white plastic molding that is attached to the lower edge of the wall just aft of the door was positioned incorrectly. When the DS slide was closed the forward edge contacted this molding and this prevented a good seal. A small amount of water got in past the seal and I found perhaps a teaspoon just under the carpet where the white nylon slide strip is located.
I also discovered one other things. The pump for the air bed will overheat when deflating and it takes 25 mins to reset. I should have paid closer attention