View Single Post
Old 07-19-2009, 07:19 AM   #15
KTManiac
Montana Master
 
Join Date: Sep 2008
Location:
Posts: 560
M.O.C. #8818

Always, always, make sure to close the grey and galley gate valves before opening the black tank valve! In fact, it is best to close them a day or two before dumping the black tank so there will be some volume of soapy grey water to rinse the sewer hose after dumping the black tank.

KTManiac is offline   Reply With Quote