quote:Originally posted by bsmeaton
no-no-no don't get confused by the 80% thing. An electrician or electrical engineer is required to observe the 80% of maximum load rule for laying out circuits based on anticipated use. That applies to branch circuits and even the main service feed. 15A still means 15A.
|
Brad is correct. Here is an explanation of why.
http://ecmweb.com/mag/electric_sizing_circuit_breaker/