View Single Post
Old 01-30-2005, 02:29 PM   #18
Montana_2048
Established Member
 
Join Date: Sep 2004
Location: La Mesa
Posts: 20
M.O.C. #2048
Richard; It sounds as though you are looking to do essentially what I did. Installed a 2000 watt inverter on the basement ceiling running the wires through the wall behind the 110/12 load panel. Purchased a 30A transfer switch from CW, routed 110 from inv through transfer switch to the leg of my 50A service which controls just about everything except the ac's (2), washer/dryer etc. The only big load is the occasional use of the micro. I haven't figured out if the converter is still trying to charge the (2) group 27's and (1) group 24 or not. My rig has an additional 50A transfer switch up front to split park power from my onan. I also installed 150watts of solar panels which for me is almost a "must have" with any inverter I have owned.

Regards..... Roy
Montana_2048 is offline   Reply With Quote