View Single Post
Old 12-02-2019, 08:34 AM   #15
jcurtis934
Montana Master
 
Join Date: Sep 2013
Location: Pensacola (mail forward service)
Posts: 3,198
M.O.C. #13740
The morryde shop works very smooth, efficient, and are great to deal with. I would imagine that two long days would get a triple done as 1.5 days does the dual. And with a triple, you would be able to use the 7k I.S. and discs. I could guess 7k for a triple axle, but that is all it would be. 17.5 inch wheels give you more capacity/safety over the 16 inch wheels that came on it.
__________________
2012 F350 6.7 L dually, 2013 3800RE with 6 pt leveling, Sumitomo 17.5" load range h tires, Samsung 18 cu ft residential fridge, 8k Morryde I.S. with disc brakes. Full timing since 2012.
jcurtis934 is offline   Reply With Quote