View Single Post
Old 09-21-2009, 02:53 PM   #3
ols1932
Montana Master
 
Join Date: Aug 2004
Location: Cedar Rapids
Posts: 4,876
M.O.C. #1944
I drilled two holes opposite each other on each end of the pvc where the holes line up with the chassis I-beam. The bottom hole needs to be larger than the top hole. Then you can mark where the holes are to be drilled in the I-beam and drill pilot holes. Then, using 1/4 X 1 1/8 self-tapping bolt with fender washer, screw the pvc to the I-beam. That's what I did with two pvc pipes. I know there are easier ways but I wanted it so the mounting would not show.

Orv
ols1932 is offline   Reply With Quote