View Single Post
Old 03-28-2018, 08:25 PM   #8
AZ Traveler
Site Team
 
AZ Traveler's Avatar
 
Join Date: Sep 2017
Location: Oro Valley
Posts: 3,932
M.O.C. #20477
Quote:
Originally Posted by Grzly03 View Post
MtlakeJim, I would like nothing more that to start that. Having been a CA General Contractor, and liking a real challenge, even at age 75 I would take it on in an instant as a GM or similar position. The main road block I can think of is simply the capital outlay. I'll bet you couldn't do it for less than $3-5M up front, considering facilities, equipment, etc.
Unless your plan is to build a single model in low numbers, $3-5M seems pretty optimistic.
__________________
Zack and Donna plus Millie and Ranger
2018 3160RL

"Life is too short to stay indoors, enjoy the ride!"
AZ Traveler is offline   Reply With Quote