Thread: best upgrade
View Single Post
Old 11-04-2010, 12:50 AM   #15
stiles watson
Montana Master
 
Join Date: Sep 2004
Location: Leona
Posts: 6,382
M.O.C. #2059
From what I saw, the factory installation would need to occur before the frame gets to Keystone. Lippert builds the frame, installs the leveling system on the frame, then ships the frame to Keystone for the building of the unit. I don't know if they are ready or capable to do that yet, but you can ask. I am not sure they have enough people trained properly at this point.
stiles watson is offline   Reply With Quote