I have done 3 sets of wet bolt conversions and never had to remove the rubber spring. In each case we just removed the shackles from the rubber spring and added the new Z-bracket and continued with the job. n our first try we took 3 hrs on the first side and about an hour and a half on the second side. After that it was usually between an hour and a half per side. I can't believe they wrote instructions to pull the rubber springs out.
|