Thread: slide toppers
View Single Post
Old 10-23-2015, 02:22 PM   #2
dieselguy
Montana Master
 
dieselguy's Avatar
 
Join Date: Feb 2005
Location: Haysville
Posts: 4,261
M.O.C. #3085
There are at least one if not 2 screws in the channel attached to the exterior wall that the topper material is attached to. With the slide in, remove the screws and slide the material say 1/4" towards the direction needed. Try the in - out routine and tweek the adjustment as needed. Reinstall the screws as all they do is keep the material positioned. This assumes there is no issue with the slide movement itself as in being noticeably skewed.
dieselguy is offline   Reply With Quote